{"id":9036,"date":"2026-05-27T15:38:13","date_gmt":"2026-05-27T12:38:13","guid":{"rendered":"https:\/\/forestukr.com\/portfolio\/construction-waste-shredding\/"},"modified":"2026-06-15T16:13:13","modified_gmt":"2026-06-15T13:13:13","slug":"construction-waste-shredding","status":"publish","type":"portfolio","link":"https:\/\/forestukr.com\/en\/portfolio\/construction-waste-shredding\/","title":{"rendered":"Crushing of construction waste"},"content":{"rendered":"<div class=\"container\">\n<div id=\"model-response-message-contentr_ea74129b34e8bd1c\" class=\"markdown markdown-main-panel enable-updated-hr-color\" dir=\"ltr\" aria-live=\"off\" aria-busy=\"false\">\n<h2 data-path-to-node=\"1\">\u041f\u043e\u0434\u0440\u0456\u0431\u043d\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u2014 \u043f\u0435\u0440\u0435\u0440\u043e\u0431\u043a\u0430 \u0437\u0430\u043b\u0456\u0437\u043e\u0431\u0435\u0442\u043e\u043d\u0443 \u0442\u0430 \u0431\u0435\u0442\u043e\u043d\u043d\u043e\u0433\u043e \u0431\u043e\u044e<\/h2>\n<p data-path-to-node=\"2\">On January 19, 2026, FOREST-UKRAINE successfully completed a complex of works on crushing construction waste for JSC Ukrnafta. The project was implemented within the framework of a tender for the provision of services for the processing and crushing of construction waste generated in the course of the enterprise&#8217;s activities. <\/p>\n<p data-path-to-node=\"3\">The main task was to crush reinforced concrete structures, foundation blocks, slabs and other construction waste into secondary material of the 0\u201360 mm fraction for further use.<\/p>\n<h3 data-path-to-node=\"4\">Crushing of concrete rubble and reinforced concrete waste<\/h3>\n<p data-path-to-node=\"5\">FOREST-UKRAINE Company completed the processing of 1,972.5 tons of construction waste at several production sites of the customer.<\/p>\n<p data-path-to-node=\"6\">The work included:<\/p>\n<ul data-path-to-node=\"7\">\n<li>\n<p data-path-to-node=\"7,0,0\">preparation of construction waste for crushing;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,1,0\">crushing of reinforced concrete structures;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,2,0\">crushing foundation blocks;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,3,0\">recycling of concrete battle;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,4,0\">sorting and storing finished material;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,5,0\">transportation of special equipment and crushing equipment between facilities.<\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"8\">The result of the work was crushed construction waste of fraction 0\u201360 mm, stored in bulk in accordance with the customer&#8217;s requirements.<\/p>\n<h3 data-path-to-node=\"9\">Geography of work performance<\/h3>\n<p data-path-to-node=\"10\">Construction waste shredding services were performed at several facilities at once:<\/p>\n<ul data-path-to-node=\"11\">\n<li>\n<p data-path-to-node=\"11,0,0\">Chernihiv region;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"11,1,0\">Poltava region;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"11,2,0\">Sumy region.<\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"12\">Thanks to the mobility of the equipment and the professional organization of the process, the work was completed within the established deadlines at all of the customer&#8217;s production sites.<\/p>\n<h3 data-path-to-node=\"1\">Special machinery and equipment for crushing construction waste<\/h3>\n<p data-path-to-node=\"2\">To carry out the work, the company hired specialized equipment and heavy machinery for processing construction waste:<\/p>\n<ul data-path-to-node=\"3\">\n<li>\n<p data-path-to-node=\"3,0,0\">mobile jaw crusher for crushing concrete and reinforced concrete;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"3,1,0\">excavators for material preparation and feeding;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"3,2,0\">loaders for storing the finished fraction;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"3,3,0\">dump trucks and auxiliary equipment for equipment logistics.<\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"4\">The use of modern crushing equipment made it possible to effectively process large-sized reinforced concrete elements and obtain high-quality secondary crushed stone.<\/p>\n<h3 data-path-to-node=\"5\">Benefits of recycling construction waste<\/h3>\n<p data-path-to-node=\"6\">Crushing concrete rubble and construction waste allows:<\/p>\n<ul data-path-to-node=\"7\">\n<li>\n<p data-path-to-node=\"7,0,0\">reduce waste disposal costs;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,1,0\">reuse secondary materials;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,2,0\">reduce the load on landfills;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,3,0\">obtain crushed stone mixture for construction and road works;<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"7,4,0\">optimize construction and dismantling costs.<\/p>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>FOREST-UKRAINE has successfully completed a complex of works on crushing construction waste for JSC Ukrnafta. The project was implemented within the framework of a tender for the provision of services for the processing and crushing of construction waste generated in the course of the company&#8217;s operations. <\/p>\n","protected":false},"author":1,"featured_media":9035,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":[],"portfolio_cat":[79],"portfolio_tags":[],"class_list":["post-9036","portfolio","type-portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_cat-recycling"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/portfolio\/9036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/comments?post=9036"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/media\/9035"}],"wp:attachment":[{"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/media?parent=9036"}],"wp:term":[{"taxonomy":"portfolio_cat","embeddable":true,"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/portfolio_cat?post=9036"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/forestukr.com\/en\/wp-json\/wp\/v2\/portfolio_tags?post=9036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}