Demolition of buildings and structures damaged as a result of hostilities

Demolition of buildings and structures damaged as a result of hostilities

The demolition of buildings and structures damaged by hostilities and terrorist acts is an important task in the process of infrastructure restoration.

15+ years of experience
2–3 days to prepare a work plan
All Ukraine service area
We will calculate the cost

Leave your contacts — our manager will contact you shortly.

    By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly.

    About the service

    The demolition of buildings and structures damaged by hostilities and terrorist acts is an important task in the process of infrastructure restoration. This process requires a comprehensive approach, as incorrect actions can cause even greater destruction and create a danger to people and the environment. You can entrust the demolition of buildings and structures damaged by hostilities to the professionals at Forest-Ukraine. We will carry out demolition work quickly, inexpensively and in accordance with the current legislation of Ukraine.

    Features of dismantling structures and buildings damaged during the war

    The process of dismantling objects damaged as a result of hostilities is regulated by Resolution No. 474 of the Cabinet of Ministers of Ukraine dated 19 April 2022. Our company strictly complies with the requirements of this legislative act when performing work. This type of dismantling is carried out if residential, commercial, industrial facilities or structures for various purposes have been damaged or destroyed as a result of the following events:

    • natural or man-made emergencies;
    • military operations;
    • terrorist acts.

    In this case, an inspection is carried out and appropriate decisions are made to eliminate the negative consequences. The legislative document contains information about the customer ordering the dismantling, the location and a brief description of the facility, the identifier (registration number) of the inspection report, and the conditions and requirements for dismantling.

    Main stages of dismantling

    The dismantling of buildings and structures damaged or destroyed as a result of hostilities and terrorist acts includes the following stages:

    • Damage assessment. Before a decision on dismantling is made, damaged objects are inspected to determine the extent of damage and hazardous areas. A decision on the need for dismantling is made.
    • Planning. Our company develops a demolition plan. At the preparation stage, we consider the sequence of work, the need to use heavy equipment and remove hazardous materials. Due attention is paid to safety measures for workers.
    • Removal of hazardous materials. Identification, removal and disposal of hazardous materials (asbestos, chemicals, etc.) are carried out.
    • Demolition of walls, roofs and other elements. Damaged structures are dismantled using specialised equipment (excavators, cranes).
    • Territory planning. Construction waste and other construction debris is collected and disposed of. The territory is cleaned and roads are cleared.

    Our company is a responsible contractor that performs work quickly and safely.

    Features of documentation development

    The development of documentation is an important step in the process of safe and effective dismantling. This process relies on the contractor, so the contractor must have relevant experience in this field. Our company is a competent contractor with a reliable reputation. We will prepare the documentation in accordance with the established requirements.

    All work is carried out in accordance with safety standards and approved dismantling technology. The main source data for the development of documentation is:

    • Decision on demolition. This is an official document confirming the need to demolish a building or structure. Without it, project documentation cannot be developed.
    • Report on the results of the survey with recommendations. A preliminary inspection of the object to be dismantled is carried out in order to identify possible hazards and make recommendations on the sequence of work.
    • Project documentation or technical passport of the facility. These documents contain important technical data about the building or structure, which is necessary for developing demolition plans.
    • Information about underground utility networks and structures, power lines and communications lines. It helps to take into account existing communication systems and take measures for their safe disconnection and dismantling.
    • Information about the presence of civil defence protective structures at the sites. This is important for ensuring worker safety during dismantling and taking into account the specific features of the structures during complete or partial dismantling.
    • Information about the location of disposal sites. For effective and environmentally safe waste disposal, transportation and removal, it is necessary to have information about the relevant disposal sites, landfills, and means of transport for delivery.

    Taking this information into account when developing dismantling documentation will help to ensure the efficiency and environmental friendliness of all work, as well as to understand the specific features of the facility and its surrounding environment.

    0
    1 2 3 4 5 6 7

    Meeting deadlines is our priority

    We work without intermediaries - we form the optimal price

    Dismantling without damaging existing buildings

    We work 7 days a week if necessary

    Development of PVR in 2–3 days (in-house designers)

    We work with dangerous objects and materials

    All necessary permits and approvals

    Our projects

    View all our works
    Dismantling of the administrative building
    Dismantling of the administrative building
    FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
    Read more
    Dismantling of the ‘Mykolaivcement’ Chimney
    Dismantling of the ‘Mykolaivcement’ Chimney
    Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
    Read more
    Dunaivtsi Elevator
    Dunaivtsi Elevator
    The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
    Read more

    Let's discuss your project

      This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.
      Thank you for your request
      Our manager will contact you shortly to answer all questions and help with the choice

      Frequently asked questions

      What is needed to calculate the cost of dismantling?

      To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

      photo of the building from the outside (from all sides) and from the inside
      technical passport or project (if available)
      height of the building and number of floors
      type of foundations (monolithic, prefabricated, pile, etc.)
      approximate distance of transportation of construction waste

      The more complete the initial information, the more accurate the calculation.
      In more complex cases, we go to the object to inspect and prepare a detailed estimate.

      What is more profitable: complete dismantling or partial dismantling with preservation of structures?

      In practice, dismantling with preservation of structures almost always turns out to be more expensive.

      This is due to the fact that:

      a significant part of the work is performed manually, without the use of heavy machinery

      the execution time increases

      the risks for workers and structures increase

      In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

      In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

      What to do with construction waste after dismantling?

      During dismantling, we immediately perform rough sorting of materials:

      metal is separated and sent for recycling
      concrete, brick and other mineral materials – separately
      wood, plastic and other waste – separately

      Furthermore, several options are possible:

      Transportation to a landfill – a standard solution, but involves additional costs for disposal
      Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
      is used for backfilling, roads, preparation of foundations
      can be implemented

      We help you choose the best option to minimize the client’s costs.

      Do you dismantle buildings damaged by hostilities?

      Yes, we have experience in performing dismantling work on objects damaged as a result of war.

      Such objects require a particularly careful approach, as they often have:

      emergency and unstable structures

      partial collapses

      increased level of danger for personnel

      Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

      If necessary, we provide:

      development of a PVR in a short time

      phased dismantling with risk minimization

      sorting and removal of construction waste

      We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

      Is a project (PVR) needed for the dismantling of a building?

      Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

      We develop PVR in a short time – usually within 2-3 working days.
      The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

      Our company provides full support:

      preparation of all necessary documentation
      maintenance of executive documentation
      work with VAT and official closing of volumes

      That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

      Do you work throughout Ukraine?

      Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

      We have our own fleet of machinery and equipment, which allows us to quickly:

      mobilize a team

      relocate equipment

      start work in a short time

      Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.

      More than 15 years of experience
      A reliable contractor
      More than 15 years of experience A reliable contractor