More than 15 years of experience
A reliable contractor
Demolition of prefabricated buildings
Panel houses are residential buildings made of reinforced concrete panels. These structures are manufactured in factories and then assembled on site. They have become popular in many countries due to their low cost, speed of construction and ease of manufacture. Old structures require proper dismantling. This is a responsible task that should be entrusted to the specialists of Forest-Ukraine. We will perform a full range of works at a favourable price for you.
Features of preparing for the demolition of apartment buildings
One of the stages of dismantling multi-apartment buildings made of panels is comprehensive preparation. At this stage, specialists from various fields are involved. Without preparation, it is impossible to demolish a building safely and efficiently.
The preparatory stage includes the following steps:
- Study of technical documentation for the building. The technical characteristics of the structure, construction plans, architectural designs and other documents are analysed. This helps to identify potential risks and determine the optimal demolition methods.
- Preparation of the work site. Before dismantling panel buildings, it is necessary to prepare the site. To do this, fences are erected, safe traffic routes are established, space is organised for storing materials and equipment, etc.
- Creating conditions for worker safety. During the demolition of apartment buildings, personnel safety is a priority. Therefore, barriers are installed to prevent falling objects, alarm and evacuation systems are organised, and briefings are conducted.
Proper preparation helps to perform further actions quickly, efficiently and reduce any risks. You can view the prices for services in the price list provided by our managers.
Techniques and methods for demolishing prefabricated buildings
There are several techniques and methods for demolishing prefabricated buildings. The most effective types of demolition are as follows:
- Manual. Building elements are dismantled using hand tools and human labour. This method is suitable for dismantling light structures and removing individual building elements.
- Mechanical. Suitable for large-scale dismantling of prefabricated buildings using special mechanisms. Excavators, bulldozers, crushers and crane installations are used for this purpose.
- Explosive. Explosives are used when it is necessary to demolish a building quickly and efficiently. Explosive demolition requires highly skilled workers and strict procedures.
When choosing a demolition method, factors such as safety, cost, size and structure of the building, purpose of the site and waste disposal requirements are taken into account.
How can waste be disposed of?
Waste disposal after dismantling is a mandatory stage that includes the following actions:
- Waste sorting.
- Recycling.
- Disposal of hazardous waste.
Waste management after the demolition of prefabricated buildings helps to make proper use of secondary resources and reduce the negative impact on the environment.
Examples of panel building demolition
Our company will demolish buildings using the following approaches:
- Demolition of prefabricated buildings using the ‘push’ technology.
- Demolition of prefabricated buildings using cranes and special equipment.
- Demolition of prefabricated buildings during city reconstruction.
Each of these demolition methods is used depending on the conditions, size and nature of the building, as well as safety requirements. To order services, fill out an online application or call us at the phone number listed on the website.
Let's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.