More than 15 years of experience
A reliable contractor

Crusher services

Crusher services

Home Recycling Crusher services

Jaw crusher is a technique used in the process of recycling construction materials. It is a mechanical device that is necessary for crushing large volumes of construction waste. Jaw crushers are used for crushing concrete, bricks, asphalt, stones and other hard materials. You can order this service from the company “Forest-Ukraine” at a low price.

The design of a jaw crusher consists of two jaws that move along a fixed axis, resembling the movement of jaws. This type of crusher has a high compressive force. It is capable of crushing large and hard construction materials into smaller fragments. The design includes the following components:

  • Cheeks: stationary and movable.
  • The frame is the main structure on which the cheeks, hydraulic drive and other components are mounted.
  • Hydraulic drive – provides the required clamping force and controls the movement of the jaws.
  • Electric motor – its size and power depend on the size and characteristics of the crusher.
  • Conveyor belt – needed to transport crushed materials to storage or further processing.
  • Loading hopper.
  • Magnetic separator.

In addition to the main components, the jaw crusher can be supplemented with additional equipment. Usually these are vibrating chutes for feeding materials, magnetic separators for removing metal impurities, conveyors, sieves and grates. They make the use of the equipment even more convenient.

Working principle of jaw crusher

The jaw crusher works on the principle of compressing and crushing the material. The following actions are performed during operation:

  • Material preparation. Large solid materials are crushed with a hydraulic hammer and fed into the plant.
  • Compression. The hydraulic drive provides movement of the movable jaw, which results in compression of the material between the stationary and movable parts.
  • Crushing. The force of compression breaks the material into smaller particles.
  • Product output. After crushing, the material exits the space between the cheeks and is fed to a storage location or further processing.

This simple principle helps to prepare building materials for future use. In our company you can rent a crusher of various capacities and sizes at an affordable price. The prices for our services are presented in the price list.

Jaw crusher services

A jaw crusher allows you to perform various services related to the crushing and processing of building materials. The most common of them are:

  • Crushing material on a construction site. The equipment can be brought to a construction site to directly crush large volumes of construction materials (concrete blocks, bricks, asphalt or stones). This allows the materials from the site to be used in further construction.
  • Processing of the material at a recycling point. This allows large pieces of solid materials to be crushed for sale, use or recycling.

Using a jaw crusher helps reduce waste and contribute to reducing the negative impact on the environment. In addition, it saves resources, which allows the company to gain additional economic benefits.

Jaw crusher application areas

Jaw crusher has a wide range of applications. It is profitable to rent this equipment for use in the following cases:

  • Crushing concrete and asphalt. You can efficiently crush old concrete, concrete blocks and asphalt into crushed material. The resulting fraction is reused in new construction projects. This can reduce the cost of purchasing new materials.
  • Processing of construction waste for further use in other projects. The jaw structure qualitatively crushes dismantled building structures, bricks, slabs, etc. This makes it possible to obtain a crushed secondary resource for various construction works.

The use of a jaw crusher in these areas helps to reduce waste and at the same time save money. Thanks to it, effective processing and use of building materials is ensured. Renting special equipment is profitable for many companies and private customers. Contact our consultants to get help in choosing the optimal model of equipment. Our equipment is ready to work, is as productive and functional as possible. To arrange a rental, call us or leave a request for feedback.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Construction waste shredding

FOREST-UKRAINE has successfully completed a complex of works on crushing construction waste for JSC Ukrnafta. The project was implemented within the framework of a tender for the provision of services for the processing and crushing of construction waste generated in the course of the company's operations.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.