Dismantling of factories
Dismantling of factories is carried out due to a decrease in demand for products, obsolescence of equipment, environmental problems or reconstruction of the territory. This is a complex process that requires comprehensive training, the use of special equipment and technology. Demolition of factories involves dismantling it into separate parts, processing and using materials for other purposes. It is worth entrusting this task to the specialists of the company “Forest-Ukraine”.
The importance of safety during plant dismantling
Safety is one of the most important aspects in the demolition and dismantling of factories. If there are any mistakes, it will lead to serious risks to people, the environment and property.
When demolishing a plant, dangerous situations may arise, such as collapsing walls or roofs, falling equipment, releases of hazardous substances, fires, etc. To avoid this, you need to entrust the dismantling to the professionals of our company.
Safety standards are taken into account at every stage of the plant’s dismantling, from planning to waste disposal.
Technical aspect of dismantling factories
Dismantling and demolition of factories involves following a certain sequence of steps, as well as creating safe conditions for workers and the environment. Industrial dismantling involves performing the following actions:
- Preparatory stage. A dismantling plan is developed, needs for equipment and tools are determined, and possible risks are analyzed.
- Dismantling of buildings and structures. At this stage, work is carried out to dismantle walls, partitions, roofs and other structures.
- Removal, disassembly and removal of equipment from the plant.
- Waste disposal. Waste is removed and recycled, and the area is cleaned of construction material and other debris.
The use of specialized equipment and tools is an extremely important aspect of factory dismantling. Our company uses excavators, bulldozers, crane platforms, certain cutting tools, etc. This allows you to speed up the dismantling process, reduce risks, and improve the quality of work. Ensuring proper conditions at the work site is the most important component of factory dismantling and demolition.
Organizational aspect of dismantling factories
Comprehensive preparation is required before the demolition of the plant. Therefore, our employees carry out the appropriate organizational work. They include clear planning of actions, organization of the work area in accordance with safety rules. After the demolition of the facility, control and evaluation are necessarily carried out. The organization includes the following actions:
- Determining the scope of work, analyzing possible risks, selecting the necessary equipment and tools.
- Development of a detailed work plan, determination of the sequence of stages and establishment of deadlines.
- Fencing the territory, regulating access of workers and visitors to the dismantling area, organizing an area for storing materials and tools.
- Conducting regular inspections of work performance and assessing its quality.
Our experienced specialists perform a full range of organizational actions. Safety requirements and environmental legislation are necessarily taken into account.
The environmental aspect of dismantling factories
When dismantling plants, it is important to strictly adhere to environmental laws. This is important for preserving the environment. The wise use of materials and resources involves their further use in other industries and proper disposal. This helps to reduce waste and save resources.
Therefore, special waste disposal plans are developed, and the latest technologies for waste processing are used. In addition, construction waste is necessarily taken to a special landfill for disposal.
Features of dismantling factories
Dismantling a plant is a complex process, especially if the plant has been in operation for many years. It is a large facility with a complex structure that may contain hazardous substances.
The presence of harmful substances and hazardous waste is one of the most difficult problems when demolishing industrial facilities. To prevent various problems, it is worth cooperating with the professionals of our company. Our specialists comply with all safety requirements when performing any dismantling work.
We have the necessary permits for high-altitude work. The employees of the company “Forest-Ukraine” have many years of experience in this field. We use modern excavators, hydraulic shears, hydraulic hammers, etc., which help us perform dismantling work of varying complexity and volume.
Our projects
View all our worksLet's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />