More than 15 years of experience
A reliable contractor

Industrial dismantling

Industrial dismantling

Home Demolition work Industrial dismantling

Industrial dismantling is the process of dismantling industrial buildings, equipment or structures for the purpose of their removal or destruction. This service is ordered for the purpose of reconstruction or demolition of outdated or unnecessary structures. Dismantling of industrial buildings is considered a complex process that should be entrusted to professionals. Works of any complexity during the demolition of buildings at reasonable prices are performed by the company “Forest-Ukraine”.

The importance of safety during industrial dismantling

Safety is very important when demolishing industrial buildings. It is a very dangerous process, with risks to workers, the environment and property. There are several reasons why safety is important for industrial demolition:

  • Risk of injury. During the demolition of industrial facilities, work may be carried out at height. Heavy structures and equipment are removed, metal is cut, and other dangerous operations are performed. To reduce the likelihood of injury to workers, you should entrust the work to our specialists.
  • Fire risk. During the dismantling of industrial buildings and structures, work may be carried out with combustible materials and flammable substances. Failure to follow instructions can lead to fires and the release of harmful substances.
  • Risk of environmental pollution. Industrial demolition of buildings may require the removal of hazardous materials (asbestos, etc.) that pose a risk to human health and the environment.
  • Risk of property damage. Industrial demolition often involves heavy structures and equipment. Mistakes can result in property damage.

To avoid troubles and unnecessary hassle, contact trusted contractors. Our company has many years of experience in the field of industrial dismantling.

Technical aspect of industrial dismantling

Dismantling industrial facilities requires the correct technical execution of all stages. To do this, our employees perform the following actions:

  • Assessment of the building condition and preparation of a work plan. The type of building, its condition, location, and surrounding areas are determined. Based on this information, a dismantling plan is drawn up.
  • Preparation: The decision to use specialized tools and equipment is made, and the building is cleaned of hazardous materials.
  • Dismantling of the building. Work is underway to dismantle and demolish structures that are no longer needed.
  • Waste removal and site cleaning. After dismantling is complete, construction waste is taken to a special landfill.

Specialized tools and equipment (excavators, cranes, and other equipment) are used to perform industrial dismantling. The complex of works during the preparation and execution of demolition allows to fulfill the tasks as efficiently as possible. At the same time, compliance with safety standards and environmental legislation is ensured.

Organizational aspect of industrial dismantling

Before carrying out a complex of works for the demolition of industrial buildings and structures, careful preparation, planning and organization of the work area are required. Our employees take into account safety rules when planning the process, and after its completion, they monitor the implementation of the tasks set.

Preparation for industrial dismantling involves assessing the condition of the building, the surrounding area, and other factors that may affect the dismantling process. A detailed plan is then drawn up regarding the sequence of work.

Organizing the work area is an equally important process. After the planned dismantling is carried out, the implementation of all points of the plan is checked. Proper organization helps to think through all stages of work in order to prepare the object for demolition.

Environmental aspect of industrial dismantling

Industrial dismantling can have a negative impact on the environment, so it is important to adhere to established safety standards. We use reasonable approaches to the use of materials and resources, ensuring their proper disposal in accordance with the requirements of Ukrainian legislation.

Features of industrial dismantling

Industrial dismantling may have certain features depending on the following nuances:

  • Type of building (factories, warehouses, office buildings, etc.).
  • Working with harmful substances.
  • Hazardous waste.
  • Security level.

Demolition of industrial facilities should be carried out only by professionals with significant experience. Therefore, it is worth contacting the specialists of our company. We always follow all instructions and have the necessary permits and licenses for work. The process uses powerful excavators, hydraulic shears and hydraulic hammers. For advice on our services, please contact the manager by phone or leave a request for feedback.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Dismantling of the administrative building

FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
Read more
" alt="title" loading="lazy" />

Dismantling of the ‘Mykolaivcement’ Chimney

Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
Read more
Dismantling at the Dunayevets elevator" alt="title" loading="lazy" />

Dunaivtsi Elevator

The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.