Demolition work is the process of dismantling building structures, equipment, or other elements to prepare the site for further work or operation. Demolition can include various types of work, such as tearing down walls, removing electrical equipment, dismantling roofs, demolishing foundations, etc. Demolition work may be required at various stages of the life cycle of a building or structure. Forest-Ukraine provides turnkey demolition services. The price of demolition work depends on the type of work and the use of professional equipment and tools.
Technical aspects of dismantling work
Our company strictly adheres to safety standards during demolition. The main demolition works for buildings and structures can be divided into the following groups:
- Demolition of building structures: demolition of walls, floors, ceilings, roofs, etc.
- Equipment removal: removal of electrical equipment, heating, ventilation, and air conditioning systems, pipelines, technological equipment, etc.
- Demolition and dismantling of foundation structures: concrete, stone, or other supporting structures, as well as deep foundation demolition.
- Cleaning the site – removal of construction waste, debris, and other materials left after demolition.
The use of specialized equipment and tools is an integral part of building demolition. Different types of demolition require different tools, which affects the price of demolition work.
We use the following modern equipment: bulldozers, excavators, crane mechanisms, cutting machines, trucks, etc. Each piece of equipment allows us to perform work with maximum efficiency.
The price of dismantling work remains acceptable for customers, given the level of service quality and professionalism of our employees. You can find out the prices for dismantling work from our managers.
Organizational aspect of turnkey dismantling works
In each case, the demolition process must be properly organized. To properly demolish buildings and dismantle structures, several sequential steps should be followed:
- Careful preparation and planning. When performing demolition work, the initial stage involves studying the object, its structure, and characteristics. Then a work plan is drawn up, and the type of equipment and tools to be used to achieve the objectives is determined. Risks are assessed and a safety plan is developed.
- Organization of the work area. The boundaries of the permissible passage in the dismantling area are established, space is allocated for the storage of materials and equipment, and safety signs are installed. Passages for trucks, waste removal, etc. are organized.
- Performance of work in compliance with approved rules and regulations.
- Control and assessment of dismantling. Work is constantly monitored, and quality and compliance with safety requirements are controlled.
Proper preparation, planning, and organization of dismantling works ensure their efficient execution. We guarantee the optimal balance between quality and cost of dismantling works.
The environmental aspect of demolition work
The environmental aspect of demolition work is important for preserving the environment and complying with legal requirements. To achieve this goal, our company adheres to the following principles:
- Rational use of materials and resources. The possibilities for recycling and reuse of materials are taken into account in order to reduce the negative impact on the environment.
- Waste minimization and disposal. Demolition work can generate large amounts of waste, so effective methods are used to minimize and dispose of it.
- Reducing negative impact on nature. To this end, it is important to use environmentally safe dismantling methods and ensure environmental restoration after completion of work.
Adherence to these principles allows you to avoid unnecessary problems and fines. It is very important for us not to harm the environment.
Order dismantling services from us
Forest-Ukraine will dismantle structures of any complexity and size. We demolish high-rise buildings, factories, industrial enterprises, and infrastructure facilities. You can count on competitive prices for dismantling and professional advice from our managers.
We have the necessary permits for work at height and a modern fleet of equipment, including powerful excavators, hydraulic shears, hydraulic hammers, etc. Our experienced staff knows how to perform their work efficiently without violating legal requirements. For consultation, please call us or leave a request for feedback on the website.
Our projects
View all our worksLet's discuss your project
Thank you for your request
video of dismantling and recycling
All videos on dismantlingFrequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />