More than 15 years of experience
A reliable contractor

Dismantling of workshops

Dismantling of workshops

Home Demolition work Industrial dismantling Dismantling of workshops

The process of dismantling a workshop includes the dismantling of building structures and equipment that were installed in industrial premises. Various methods are used for demolition. Dismantling of workshops is carried out mechanically or manually. Demolition and dismantling may be required during the reconstruction of an industrial facility, a change in the purpose of the building, or its physical or moral obsolescence. You can entrust the demolition of workshops, as well as other industrial buildings and structures to the company “Forest-Ukraine”. We will do the work quickly, efficiently, and inexpensively.

The importance of safety during shop dismantling

Safety is the most important component of any construction work, in particular the demolition and dismantling of workshops. This process is characterized by a high level of danger, during which risks may arise for the life and health of people, property and the environment. The main dangers during the demolition of a workshop:

  • possibility of falling from a height;
  • damage by toxic materials;
  • collapse of walls and ceilings;
  • occurrence of fires.

To prevent these risks, our employees strictly adhere to safety and legal requirements. This guarantees safe and prompt dismantling and demolition of workshops.

Technical aspect of dismantling workshops

Dismantling and demolition of workshops requires the use of special technical means and compliance with the following stages:

  • Preparatory work. An inspection of the facility is carried out, a dismantling plan is drawn up, the needs for equipment and tools are determined, the work area is prepared, and safety zones are established.
  • Dismantling of communications. Before demolition, communications (electrical wiring, plumbing, sewage, ventilation, air conditioning, etc.) are removed, and all equipment and other items in the premises are removed.
  • Dismantling of external structures. The roof, walls and other elements that can be removed externally are dismantled.
  • Dismantling of interior structures. Partitions, ceilings, floors, etc. are dismantled.
  • Demolition of the foundation. The foundation is also removed, and the excavation is filled in.
  • Waste disposal. Waste is collected, transported and disposed of in accordance with legal requirements.

During the dismantling of workshops, excavators, bulldozers, cranes, special tools for removing concrete, steel structures, etc. are used.

Organizational aspect of dismantling workshops

During demolition or dismantling, a number of organizational actions are carried out. It is necessary to approach the process comprehensively:

  • Preparation for dismantling of workshops. The facility is inspected, and then it is determined what work needs to be done, the required list of specialized equipment and tools.
  • Demolition planning. Each stage of the work is carefully thought out, including deadlines, sequence of execution, resource and equipment requirements. Our employees take into account possible risks and implement preventive measures.
  • Organization of the work area and compliance with the rules. It is necessary to establish a safety zone. It is calculated where the area for passers-by, equipment parking, etc. will be. To prevent dangerous situations, appropriate signs, barriers and other warning devices are installed.
  • Control and evaluation of the work performed. During the dismantling of the workshop, constant control over the performance of the work and compliance with safety rules is carried out.

It is important to remember that dismantling a workshop is a complex process that requires proper training and a high level of responsibility. Therefore, this work should be entrusted to the specialists of our company.

Environmental aspect of dismantling workshops

The environmental aspect of shop dismantling is quite important and is taken into account at every stage of the work. To ensure minimal environmental impact during shop dismantling, our employees adhere to certain principles:

  • Rational use of materials and resources.
  • Waste minimization and recycling.
  • Reducing negative impact on the environment.

Implementing the environmental aspect of shop dismantling helps reduce the negative impact on the environment and ensures compliance with the requirements of Ukrainian legislation.

Features of dismantling workshops

Dismantling of workshops may have its own characteristics depending on the type of premises, its design and purpose. It may be necessary to carry out work at great heights and work with heavy structures. Our specialists take all the features into account in advance when planning the work.

Our company has many years of experience in performing demolition and dismantling of various industrial structures. You can see examples of work on the website. Our employees use modern methods, efficient equipment and have the necessary permits for work at height.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Dismantling of the administrative building

FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
Read more
" alt="title" loading="lazy" />

Dismantling of the ‘Mykolaivcement’ Chimney

Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
Read more
Dismantling at the Dunayevets elevator" alt="title" loading="lazy" />

Dunaivtsi Elevator

The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.