Forest-Ukraine company provides construction and demolition work anywhere in Ukraine

Construction

“Forest-Ukraine” is a reliable construction company that works for people

We combine the ability of designers to think outside the box, the craftsmanship of builders, and the professionalism of administrative staff. The company is a member of the Confederation of Builders of Ukraine.

Forest-Ukraine company provides construction and demolition work anywhere in Ukraine. We are a general contractor with CC2, CC3 licenses, which significantly reduces the cost of construction, demolition, and other types of work. We work throughout Ukraine.

We are not the type who delegate all work to other contractors. We do everything ourselves and are distinguished by well-coordinated processes. At the same time, we are not self-taught, but have professional specialized education and all necessary licenses to perform work.

Forest can be entrusted with Serious Construction Issues

Residential construction

Concrete road construction

Building reconstruction

reliable construction company that works for people

<p><a href=Repair of the road from PJSC “Podilsky Cement” to the H-03 highway “Zhytomyr-Chernivtsi” has been completed

" loading="lazy" />
High-quality roads are an integral part of the development of the infrastructure of every country. Now we want to present the successfully completed project to repair the road section from PJSC "Podilsky Cement" to the H-03 highway "Zhytomyr-Chernivtsi". This initiative was aimed at restoring the worn-out road infrastructure and ensuring safe and comfortable movement for road users. Thanks to the coordinated work and persistent efforts of specialists, we managed to successfully implement this important project.
<p><a href=Works on the modernization project of the kagatnoy field at the sugar factory

" loading="lazy" />
The company "Forest-Ukraine" carries out the construction of objects of the agro-industrial complex. Thus, a large-scale project to modernize the kagatnoy field at the sugar factory was recently successfully completed. This work became another example of the high professionalism and dedication of our team.
The townspeople were very happy when, 30 years ago, construction began on a five-story building with an area of ​​9,000 m² near the park — the future medical and therapeutic center with swimming pools and hydrotherapy. However, due to difficult times, the construction was only 54% completed, and it stood unfinished for three decades. The Horokhiv district and city councils tried to find an investor, offering several apartments for social housing, but there were no willing buyers.
<p><a href=Commissioning of the Lypynskyi+ reinforced concrete plantЗдача в експлуатацію ЖБ Липинський+

" loading="lazy" />
The Lypynsky+ residential complex is a new project in the city of Lutsk, which was recently put into operation. The completion of this building is an important event for our construction company. The new residential complex is ready to receive apartment owners and has a developed infrastructure.

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.