More than 15 years of experience
A reliable contractor

Dismantling of silos

Dismantling of silos

Home Demolition work Industrial dismantling Dismantling of silos

Dismantling of silos is carried out very carefully, observing safety precautions. First, the type and structure of the object are determined, since it can be made of different materials and have a certain design. If mistakes are made when demolishing silos, this can lead to negative consequences. Therefore, only professionals are engaged in such work. The company “Forest-Ukraine” has the necessary permits and extensive experience in demolishing industrial facilities. We guarantee high quality services and favorable prices.

The importance of safety when dismantling silos

Demolition and dismantling of silos is a dangerous process, so proper preparation and adherence to the work plan are required. Otherwise, everything will end with serious consequences for people and property.

During the dismantling of the silo, it is necessary to exclude falls from a height, damage from collapses, injuries from power tools and other devices, gas poisoning, fires, etc.

Also, in case of improper demolition of the silo, there may be a danger to the environment. Various chemicals can pollute the soil and water. Therefore, this work cannot be performed by untrained workers. Dismantling of the silo will be carried out qualitatively, quickly and safely by the specialists of our company.

Technical aspect of silo dismantling

Special equipment is used to dismantle and demolish silos. The process involves careful planning and risk assessment, the use of certain equipment and tools, and compliance with safety requirements. Let’s consider the main stages of dismantling and demolishing silos:

  • Preparatory stage. The type of silo, its dimensions and location are determined. The condition of the structure is inspected and assessed, and possible risks and hazards that may arise during dismantling are identified.
  • Cutting into parts. Special tools are used, such as cutting vises, grinders, cutters, etc.
  • Dismantling of parts. After cutting the silo into parts, they are removed and transported safely. Special equipment, including a crane, excavator, loader, is used to remove and move the silo parts.
  • Removal of debris. The work area is cleared of construction debris. Trucks for transporting debris, washing machines, etc. are used.

The use of specialized equipment and tools can significantly reduce working time and risks. Our company’s employees act according to instructions, without violating safety standards during the demolition of structures.

Organizational aspect of silo dismantling

The organizational aspect of silo dismantling involves planning, coordination and control over the execution of work. The main stages of organizing silo dismantling are as follows:

  • Development of a plan for dismantling the silo. This work is carried out after studying the design features. Planning of the work area, assessment of risks and hazards, coordination of work, selection of equipment and tools, determination of the duration of the process are carried out.
  • Coordination of work. The plan is implemented and the process of dismantling the silo is monitored. Coordination of work includes safety measures in the work area and monitoring of the work.
  • Ensuring safety. This is the main priority during silo dismantling. It is necessary to create safe conditions for workers and the environment.

Proper organization is no less important than the proper technical execution of all stages of work.

Environmental aspect of silo dismantling

During the dismantling of silos, we ensure that the negative impact on the environment is minimized and that materials and resources are used wisely. We adhere to the following approaches:

  • Smart use of all resources.
  • Waste minimization and recycling.
  • Reducing negative environmental impact.

Compliance with environmental legislation is mandatory during the demolition of industrial facilities.

Examples of successful silo dismantling practices

Our company successfully carries out silo demolition at various facilities. In particular, we successfully dismantled the CRH cement plant. You can view the report describing the work process on our website.

We are often approached by large Ukrainian manufacturers. Our company fulfills orders of any complexity. So far, we have successfully completed 121 orders, we have been working in the field of demolition of buildings and structures for over 10 years. During this time, the list of clients has reached 82 customers. All of them were satisfied with our work.

The company “Forest-Ukraine” strictly adheres to the established instructions and requirements of the legislation. You can find out the price from our consultants. Call the contact phone number or leave a request for feedback.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Dismantling of the administrative building

FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
Read more
" alt="title" loading="lazy" />

Dismantling of the ‘Mykolaivcement’ Chimney

Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
Read more
Dismantling at the Dunayevets elevator" alt="title" loading="lazy" />

Dunaivtsi Elevator

The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.