More than 15 years of experience
A reliable contractor

Demolition of high-rise buildings

Demolition of high-rise buildings

Home Demolition work Demolition of high-rise buildings

The demolition of high-rise buildings is a complex and labour-intensive process that must be carried out with safety risks and environmental protection requirements in mind. This service should be ordered when a building has become dangerous or obsolete and needs to be replaced with another structure. This work should only be entrusted to professionals. The employees of Forest-Ukraine will perform high-rise demolition quickly and efficiently.

The importance of safety during the demolition of high-rise buildings

Safety is the most important aspect when demolishing high-rise buildings. Incorrect demolition is dangerous for workers and the environment, so compliance with established rules and requirements is critical.

Our company takes the following safety aspects into account when dismantling high-rise buildings and structures:

  • Determining the safety zone around the building.
  • Provision of effective dismantling equipment and machinery (crane, aerial platform, lifting mechanisms, working platforms, etc.).
  • Careful inspection of the building and its details to identify the most risky areas and prepare a safe action plan.
  • Ensuring the removal of materials from the building.
  • Verification of compliance with occupational health and safety requirements.
  • Ensuring proper waste disposal at the disposal site.

The factors listed above affect the safety and quality of high-rise building demolition.

Technical aspects of dismantling high-rise buildings

The technical aspect of dismantling high-rise structures requires detailed planning and the use of specialised equipment and tools. The main stages of high-rise demolition include:

  • Preparatory stage: the condition of the building is assessed, an action plan is developed, and equipment and tools are deployed.
  • Demolition of external walls and roof: removal of external cladding and building frame, dismantling of the roof.
  • Dismantling of internal structures: dismantling of internal partitions, floors and ceilings.
  • Demolition of the foundation: the foundation is removed and the site is prepared for further construction or other uses.

The use of specialised equipment and tools helps to perform work efficiently and safely.

Organisational aspects of dismantling high-rise buildings

The organisational stage involves preparing for the demolition of high-rise buildings, planning, organising the work area and complying with safety regulations, as well as monitoring and evaluating the work performed.

Preparation for the demolition of high-rise buildings includes assessing the condition of the building, studying designs and documentation, and identifying potential risks and opportunities. This is followed by planning. At this stage, the sequence of work and time frame, the necessary equipment and the number of workers are determined.

When organising the work area, the construction site is prepared. Subsequently, the processes carried out need to be monitored and evaluated. All organisational issues during the demolition of buildings are resolved by our employees.

The environmental aspect of dismantling high-rise buildings

The environmental aspect of dismantling high-rise buildings is very important. Failure to comply with approved requirements has a negative impact on the environment. In addition, improper disposal can result in a large fine.

Strategies for the intelligent use of materials and resources are employed, reducing the negative impact on the environment.

Features of dismantling high-rise buildings

The demolition of high-rise buildings has certain characteristics that our employees take into account when preparing and carrying out demolition work. The main ones are as follows:

  • The impact of the building’s location. High-rise buildings located in the city centre or in confined spaces require a special approach and the use of specific techniques.
  • Features of working at height. Since the work is performed at height, this also increases the risks for employees. That is why they are provided with high-quality personal protective equipment.
  • Use of specialised equipment and tools. These include crane mechanisms and platforms, hydraulic lifts, telescopic lifts, etc. The use of such equipment helps to reduce the risk of accidents, speed up work and ensure efficient dismantling.

Compliance with all necessary rules and regulations is important when performing tasks of varying complexity.

Our company has the necessary permits and licences to perform high-altitude demolition work. Our team consists of experienced employees and uses specialised equipment, including a Case 460CX long-reach excavator with hydraulic shears (boom height 27 m).

For consultation, please call the contact number or leave a request for feedback.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Dismantling of the administrative building

FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
Read more
" alt="title" loading="lazy" />

Dismantling of the ‘Mykolaivcement’ Chimney

Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
Read more
Dismantling at the Dunayevets elevator" alt="title" loading="lazy" />

Dunaivtsi Elevator

The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.