Brick buildings are typical structures used in urban development. Brick buildings have been popular for many years. They have made a significant contribution to urban architecture. But over time, there is a need to dismantle brick buildings that have become unusable for certain reasons. The employees of the Forest-Ukraine company are able to perform this work qualitatively, safely and taking into account modern requirements.

Preparing for the dismantling of brick buildings

Proper preparation before dismantling brick houses is a prerequisite for the quality performance of the following stages of work. This procedure includes the following processes:

  • Studying the technical documentation for the building. It is important to familiarize yourself with information about the structure, materials, and condition of the building, and to assess possible risks. This will help develop an effective plan of further action and determine the necessary safety measures.
  • Preparation of the work site. The area is cleared of excess materials, walkways and safety zones are arranged, and the necessary equipment and tools are installed.
  • Employee safety measures. Required safety measures include providing protective equipment, conducting safety briefings, and installing barriers and fences.

These preparatory works contribute to the efficient and safe dismantling of brick buildings.

Techniques and methods for dismantling brick houses

The dismantling process uses proven techniques and methods, including:

  • Manual dismantling. Dismantling brick buildings is done using hand tools. The process is carried out step by step and is used when the building is small or you need to work in a narrow space.
  • Mechanical dismantling. Special equipment is used for this, this speeds up the work, which is important for large buildings.
  • Explosive demolition. This method is appropriate when large brick buildings need to be demolished quickly and efficiently. Controlled explosions are used to destroy the building and break it into pieces.

Our specialists choose the most suitable methods taking into account the project requirements. The price depends on the choice of dismantling technique, which can be found in our price list.

What to do with waste?

After dismantling brick buildings, it is necessary to dispose of the waste. For this, our company uses the following methods:

  • Sorting construction waste.
  • Recycling for reuse.
  • Disposal of hazardous waste.

This allows for a reduction in waste, contributes to the sustainable development of the construction industry, and reduces the negative impact on the environment.

Examples of dismantling brick buildings

Our company has extensive experience in the field of demolition of brick and other buildings and structures, especially in the following projects:

  • Dismantling of brick buildings using mechanisms and equipment.
  • Dismantling brick buildings yourself using hand tools.
  • Dismantling of brick buildings during the reconstruction of the city.

Our employees strictly comply with the requirements of Ukrainian legislation. We have all the necessary special equipment and tools to perform dismantling safely and with minimal costs for customers. To order a service, call us or write in the feedback form on the website.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Our projects

View all our works
" alt="title" loading="lazy" />

Dismantling of the administrative building

FOREST-UKRAINE Company performed comprehensive dismantling work on the dismantling of an administrative building for Concern Galnaftogaz. The main objective of the project was to safely dismantle the building in dense construction conditions and without completely stopping the gas station.
Read more
" alt="title" loading="lazy" />

Dismantling of the ‘Mykolaivcement’ Chimney

Construction company "Forest-Ukraine" - in 2021 we successfully dismantled a chimney at the "Mykolaivcement" enterprise. In addition to the construction of residential buildings and structures, we have long specialized in dismantling buildings and industrial facilities throughout Ukraine
Read more
Dismantling at the Dunayevets elevator" alt="title" loading="lazy" />

Dunaivtsi Elevator

The company "Forest-Ukraine" once again proved its ability to competently complete extremely complex tasks. The company's specialists, led by the director and chief engineer, developed a detailed plan for the safe and effective dismantling of the grain receiving device from the vehicle at the Dunayevets elevator.
Read more

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.