More than 15 years of experience
A reliable contractor

Transportation of oversized cargo

Transportation of oversized cargo

Home Transportation of oversized cargo

Transportation of oversized cargo is a separate area of ​​logistics. These are services for the transportation of extremely large or heavy cargo that cannot be transported by standard trucks. Ordering oversized transportation is necessary when moving huge machines, equipment, structures, ships, transformers, generators, etc. You can order services for the transportation of oversized cargo from the Forest-Ukraine company at an affordable price.

Transportation of oversized cargo

Transportation of oversized cargo has several features that distinguish it from the transportation of ordinary cargo. Such cargo has dimensions or weight that exceed standard restrictions and norms. Typically, such items include:
● Large machinery and equipment: construction machinery, trucks, industrial equipment.
● Structural elements: building structures (beams, columns), steel plates, pipes of significant diameter.
● Energy equipment: turbines, generators, transformers.
● Metal products: ship sections, metal structures for bridges, etc.
● Water transport: yachts, tankers, land vessels.
To perform such a service, special planning and coordination of actions are required.
Transportation of oversized cargo requires detailed route planning, taking into account restrictions on roads, bridges, tunnels and other infrastructure facilities.
It will also be necessary to obtain the appropriate permits and coordinate steps with local authorities.

Requirements for the transportation of oversized cargo

Oversized transportation may have some difficulties in implementation. This service is organized and provided in accordance with the established legal norms.
Let’s consider the main ones:
● Each country has relevant laws and regulations that regulate the transportation of oversized cargo. They must be strictly observed so that the service is performed quickly and without problems with the law.
● Before transportation, it is worth taking certain preparatory measures. In particular, the condition of the cargo is checked, its reliable fastening and packaging are ensured. It may be necessary to dismantle parts or equipment to reduce the dimensions and increase the stability of the cargo.
● Special documents and permits are usually required for the transportation of oversized cargo.

Our company has many years of experience in the field of oversized transportation, so our clients trust us. Specialists work together to ensure high-quality transportation in accordance with current requirements. To find out the cost of our services, check out the price list. You will be convinced that we set affordable prices for all services.

Tips for transporting oversized cargo

Oversized cargo requires proper transportation. This is a complex process that should be entrusted to the professionals of our company. To ensure quality transportation, follow these tips: ● Choosing the optimal transport. The vehicle must match the dimensions and weight of the cargo. For example, low-frame platform trailers, specialized trucks, etc. can be used. Sometimes it is advisable to use a cargo container or special packaging that will ensure cargo protection and stability during movement. ● Proper preparation is required. Before transportation, the cargo must be prepared. An inspection and check for damage are carried out. Appropriate fastening of the structure using chains, slings or other means is ensured. If necessary, individual parts are dismantled to facilitate loading and reduce dimensions. ● It is worth following road safety rules and cargo transportation standards. For this purpose, signaling devices are used to warn other drivers about the presence of oversized cargo. You may need support, for which a special service or an escort car is involved. To ensure that the transportation is carried out in a timely and high-quality manner, turn to professionals. Our company has everything you need to deliver safely, quickly and in compliance with the approved requirements. If you do not pay enough attention to the preparation and standards for transporting oversized cargo, you may encounter serious difficulties. The cargo may be damaged or there may be delays on the way. This will lead to loss of profit and other troubles.
Therefore, the transportation of oversized cargo should be approached responsibly. This is a rather complex logistical task, the implementation of which should be entrusted only to experienced performers. Our company solves problems of any complexity during transportation and adheres to all agreements.

0
1 2 3 4 5 6 7

Meeting deadlines is our priority

We work without intermediaries - we form the optimal price

Dismantling without damaging existing buildings

We work 7 days a week if necessary

Development of PVR in 2–3 days (in-house designers)

We work with dangerous objects and materials

All necessary permits and approvals

Let's discuss your project

    Comment

    This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly to answer all questions and help with the choice

    Frequently asked questions

    What is needed to calculate the cost of dismantling?

    To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

    photo of the building from the outside (from all sides) and from the inside
    technical passport or project (if available)
    height of the building and number of floors
    type of foundations (monolithic, prefabricated, pile, etc.)
    approximate distance of transportation of construction waste

    The more complete the initial information, the more accurate the calculation.
    In more complex cases, we go to the object to inspect and prepare a detailed estimate.

    What is more profitable: complete dismantling or partial dismantling with preservation of structures?

    In practice, dismantling with preservation of structures almost always turns out to be more expensive.

    This is due to the fact that:

    a significant part of the work is performed manually, without the use of heavy machinery

    the execution time increases

    the risks for workers and structures increase

    In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

    In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

    What to do with construction waste after dismantling?

    During dismantling, we immediately perform rough sorting of materials:

    metal is separated and sent for recycling
    concrete, brick and other mineral materials – separately
    wood, plastic and other waste – separately

    Furthermore, several options are possible:

    Transportation to a landfill – a standard solution, but involves additional costs for disposal
    Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
    is used for backfilling, roads, preparation of foundations
    can be implemented

    We help you choose the best option to minimize the client’s costs.

    Do you dismantle buildings damaged by hostilities?

    Yes, we have experience in performing dismantling work on objects damaged as a result of war.

    Such objects require a particularly careful approach, as they often have:

    emergency and unstable structures

    partial collapses

    increased level of danger for personnel

    Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

    If necessary, we provide:

    development of a PVR in a short time

    phased dismantling with risk minimization

    sorting and removal of construction waste

    We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

    Is a project (PVR) needed for the dismantling of a building?

    Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

    We develop PVR in a short time – usually within 2-3 working days.
    The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

    Our company provides full support:

    preparation of all necessary documentation
    maintenance of executive documentation
    work with VAT and official closing of volumes

    That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

    Do you work throughout Ukraine?

    Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

    We have our own fleet of machinery and equipment, which allows us to quickly:

    mobilize a team

    relocate equipment

    start work in a short time

    Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.