Construction waste processing

Construction waste processing

The company "Forest-Ukraine" provides services for the processing of construction waste.

15+ years of experience
2–3 days to prepare a work plan
All Ukraine service area
We will calculate the cost

Leave your contacts — our manager will contact you shortly.

    By clicking the button, you agree to the processing of personal data.

    Thank you for your request

    Our manager will contact you shortly.

    About the service

    The company “Forest-Ukraine” provides services for the processing of construction waste. In the conditions of active restoration of Ukraine’s infrastructure, especially given the consequences of the war, this service becomes particularly relevant and significant.

    The need to process construction waste

    Construction debris and waste are materials generated as a result of the construction, reconstruction, repair and demolition of buildings and structures. Improper handling of such waste creates environmental threats, including contamination of groundwater and soil with toxic leachate, dust pollution of atmospheric air with hazardous substances, and complications of the sanitary and epidemiological situation.

    Proper disposal of reinforced concrete and other construction waste has significant social and economic benefits. It reduces the burden on the environment and saves natural resources.

    Regulatory and legal regulation of construction waste processing

    On July 9, 2023, the Law of Ukraine “On Waste Management” dated June 20, 2022 No. 2320-IX came into force. It marked a reform and introduced changes to previously established terminology and rules.

    According to Part 2 of Article 16 of the Law of Ukraine No. 2320-IX, waste generators, except for household waste generators, are obliged to process waste independently, if they have a permit, or transfer it for processing to waste management entities that have such a permit.

    In the context of reconstruction work aimed at overcoming the consequences of armed conflict and military operations, it is worth emphasizing the special status of the management of debris and waste from destruction. Such actions carried out during the martial law, as well as during the 90-day period after its termination or cancellation in Ukraine, are exempt from the need to undergo an environmental impact assessment (EIA). This provision applies both to the war period itself and to the initial phase of reconstruction.

    Solution from Forest-Ukraine

    Our company offers a comprehensive solution for the processing and disposal of concrete and reinforced concrete, other construction waste obtained as a result of the economic activities of enterprises, as a result of the dismantling of buildings and structures.

    Our services include processing (recycling) of various construction waste, such as concrete, reinforced concrete, brick waste, and other construction materials. The advantages of cooperation with our company are as follows:

    • Availability of own base, mechanisms and equipment for recycling construction waste.
    • Compliance with the highest environmental standards.
    • Full compliance with the requirements of current legislation.
    • No need for the customer to develop an environmental impact assessment (EIA) project.

    Our company has successfully implemented a number of construction waste processing projects, which has significantly reduced the burden on the environment and contributed to the efficient use of resources. Recycling and reuse of construction materials not only reduces the amount of waste in landfills, but also helps save natural resources and reduce construction costs.

    How to order a service?

    To order construction waste processing services from Forest-Ukraine, call our consultants. We will provide answers to questions regarding the necessary documents and stages of cooperation.

    Our company calls for cooperation from everyone who is interested in an effective and environmentally responsible solution to the problem of construction waste. Our innovative approach allows us to be a reliable partner in the field of recycling.

    0
    1 2 3 4 5 6 7

    Meeting deadlines is our priority

    We work without intermediaries - we form the optimal price

    Dismantling without damaging existing buildings

    We work 7 days a week if necessary

    Development of PVR in 2–3 days (in-house designers)

    We work with dangerous objects and materials

    All necessary permits and approvals

    Our projects

    View all our works
    Crushing of construction waste
    Crushing of construction waste
    FOREST-UKRAINE has successfully completed a complex of works on crushing construction waste for JSC Ukrnafta. The project was implemented within the framework of a tender for the provision of services for the processing and crushing of construction waste generated in the course of the company's operations.
    Read more

    Let's discuss your project

      This site is protected and applied to it Privacy Policy. By clicking the button, you agree to the processing of personal data.
      Thank you for your request
      Our manager will contact you shortly to answer all questions and help with the choice

      Frequently asked questions

      What is needed to calculate the cost of dismantling?

      To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:

      photo of the building from the outside (from all sides) and from the inside
      technical passport or project (if available)
      height of the building and number of floors
      type of foundations (monolithic, prefabricated, pile, etc.)
      approximate distance of transportation of construction waste

      The more complete the initial information, the more accurate the calculation.
      In more complex cases, we go to the object to inspect and prepare a detailed estimate.

      What is more profitable: complete dismantling or partial dismantling with preservation of structures?

      In practice, dismantling with preservation of structures almost always turns out to be more expensive.

      This is due to the fact that:

      a significant part of the work is performed manually, without the use of heavy machinery

      the execution time increases

      the risks for workers and structures increase

      In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.

      In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.

      What to do with construction waste after dismantling?

      During dismantling, we immediately perform rough sorting of materials:

      metal is separated and sent for recycling
      concrete, brick and other mineral materials – separately
      wood, plastic and other waste – separately

      Furthermore, several options are possible:

      Transportation to a landfill – a standard solution, but involves additional costs for disposal
      Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
      is used for backfilling, roads, preparation of foundations
      can be implemented

      We help you choose the best option to minimize the client’s costs.

      Do you dismantle buildings damaged by hostilities?

      Yes, we have experience in performing dismantling work on objects damaged as a result of war.

      Such objects require a particularly careful approach, as they often have:

      emergency and unstable structures

      partial collapses

      increased level of danger for personnel

      Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.

      If necessary, we provide:

      development of a PVR in a short time

      phased dismantling with risk minimization

      sorting and removal of construction waste

      We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.

      Is a project (PVR) needed for the dismantling of a building?

      Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).

      We develop PVR in a short time – usually within 2-3 working days.
      The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.

      Our company provides full support:

      preparation of all necessary documentation
      maintenance of executive documentation
      work with VAT and official closing of volumes

      That is, the client receives not only work, but a completely closed process in terms of documents and reporting.

      Do you work throughout Ukraine?

      Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.

      We have our own fleet of machinery and equipment, which allows us to quickly:

      mobilize a team

      relocate equipment

      start work in a short time

      Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.

      More than 15 years of experience
      A reliable contractor
      More than 15 years of experience A reliable contractor