Residential complex Lypynsky+
Tasks from the Customer
The construction company “FOREST-UKRAINE” was assigned the task of performing the functions of a general contractor in the construction of a modern residential complex in the village of Lypyny near the city of Lutsk. The main goal of the project was to build comfortable housing in compliance with high quality standards, modern construction technologies and established deadlines.
Completed works
As part of the implementation of the Lypynsky+ residential complex project, our company provided a full range of construction works:
- organization and management of the construction process as a general contractor;
- coordination of the work of subcontracting organizations;
- carrying out preparatory and earthworks;
- performance of general construction works;
- installation of engineering networks;
- quality control at all stages of construction;
- compliance with the work schedule and requirements of project documentation;
- commissioning of the facility.
Result
As a result of the successful implementation of the project, a modern residential complex was built that meets the current requirements for comfortable and energy-efficient housing. Thanks to a professional approach to construction management, effective interaction with all project participants, and proper technical control, the facility was completed on time.
Why choose us as a general contractor?
Our company has significant experience in the construction of residential, commercial and industrial facilities. We provide a full cycle of work – from the preparation of the construction site to the delivery of the finished object to the customer. The functions of a general contractor allow us to effectively manage resources, control the quality of construction and guarantee timely completion of work.
Key areas of activity:
- будівництво житлових комплексів;
- construction of residential complexes;
- construction project management;
- industrial and civil construction;
- comprehensive implementation of turnkey construction projects.
Final result
Work process
Let's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.