Residential complex Lypynskyi
Tasks from the Customer
Our company was involved in the implementation of the construction project of the Lypynsky residential complex as a general contractor. The main task was to provide a full range of construction and installation works, coordinate construction participants, and control the quality of work at all stages of project implementation.
Object characteristics
The Lypynskyi Residential Complex is a modern multi-apartment residential complex in the suburbs of Lutsk, consisting of four eight-story sections.
Main characteristics of the object:
- construction technology – brickwork;
- the material of the external walls is ceramic brick;
- facade insulation – mineral wool and polystyrene foam;
- facade decoration – decorative mineral plaster;
- energy-efficient window structures in accordance with current building codes;
- closed balconies and loggias;
- autonomous boiler room to provide heating;
- centralized water supply.
Completed works
As part of the project, our team provided:
- construction site organization;
- performance of general construction works;
- coordination of the work of subcontracting organizations;
- quality control and compliance with design decisions;
- performing the functions of a general contractor;
- compliance with the construction schedule and customer requirements;
- preparation of executive documentation, commissioning of the facility.
Result
As a result of the project, a modern comfort-class residential complex was built, which became part of the residential development of the suburbs of Lutsk. The facility was successfully put into operation in 2018 and is equipped with all the necessary utilities for comfortable living of residents.
General contractor for the construction of residential complexes
Our company has experience in performing general contractor functions during the construction of residential, commercial and industrial facilities. We provide comprehensive construction management, quality control of works, coordination of contractors and timely commissioning of facilities.
Final result
Let's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.