Crushing of construction waste
Подрібнення будівельних відходів — переробка залізобетону та бетонного бою
On January 19, 2026, FOREST-UKRAINE successfully completed a complex of works on crushing construction waste for JSC Ukrnafta. The project was implemented within the framework of a tender for the provision of services for the processing and crushing of construction waste generated in the course of the enterprise’s activities.
The main task was to crush reinforced concrete structures, foundation blocks, slabs and other construction waste into secondary material of the 0–60 mm fraction for further use.
Crushing of concrete rubble and reinforced concrete waste
FOREST-UKRAINE Company completed the processing of 1,972.5 tons of construction waste at several production sites of the customer.
The work included:
-
preparation of construction waste for crushing;
-
crushing of reinforced concrete structures;
-
crushing foundation blocks;
-
recycling of concrete battle;
-
sorting and storing finished material;
-
transportation of special equipment and crushing equipment between facilities.
The result of the work was crushed construction waste of fraction 0–60 mm, stored in bulk in accordance with the customer’s requirements.
Geography of work performance
Construction waste shredding services were performed at several facilities at once:
-
Chernihiv region;
-
Poltava region;
-
Sumy region.
Thanks to the mobility of the equipment and the professional organization of the process, the work was completed within the established deadlines at all of the customer’s production sites.
Special machinery and equipment for crushing construction waste
To carry out the work, the company hired specialized equipment and heavy machinery for processing construction waste:
-
mobile jaw crusher for crushing concrete and reinforced concrete;
-
excavators for material preparation and feeding;
-
loaders for storing the finished fraction;
-
dump trucks and auxiliary equipment for equipment logistics.
The use of modern crushing equipment made it possible to effectively process large-sized reinforced concrete elements and obtain high-quality secondary crushed stone.
Benefits of recycling construction waste
Crushing concrete rubble and construction waste allows:
-
reduce waste disposal costs;
-
reuse secondary materials;
-
reduce the load on landfills;
-
obtain crushed stone mixture for construction and road works;
-
optimize construction and dismantling costs.
Final result
Work process
Let's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.