Read more
16 December, 2020
Commissioning of the Lypynskyi+ reinforced concrete plantЗдача в експлуатацію ЖБ Липинський+
The Lypynsky+ residential complex is a new project in the city of Lutsk, which was recently put into operation. The completion of this building is an important event for our construction company. The new residential complex is ready to receive apartment owners and has a developed infrastructure. Information about the new building Lypynsky+ The Lypynskyi+ […]
Read more
Read more
01 June, 2018
Advantages of “Forest-Ukraine”
Advantages of “Forest-Ukraine” when choosing a company that will dismantle buildings:
Payment can be made from the proceeds from the sale of metal and rubble obtained as a result of dismantling – Removal and disposal of construction debris
Processing of dismantled structures into secondary building materials (fractional crushed stone)
[…]
Read more
Read more
01 June, 2018
Builder’s Handbook: Requirements for Masonry Quality
During the work, the bricklayer must ensure that the mortar and bricks specified in the working drawings are used, and that the horizontal and vertical joints are completely filled with mortar. It is impossible to allow empty spaces in the joints of the masonry unnecessarily. This weakens it and reduces its durability. During the […]
Read more
Read more
01 June, 2018
Construction of the residential building “Lypynsky Plus”
Currently, the construction of the residential building “Lypynsky Plus” is underway, located in the village of Lypyny at 1 Maria Zankovetska Street. It is planned to build 6,500 sq. m. of residential and 1,000 sq. m. of non-residential space.
“Forest-Ukraine”, as the general construction contractor, is primarily responsible for the quality of […]
Read more