Dismantling factories is a complex process that has many features. To perform all actions correctly, the performers need experience and compliance with special technologies. Demolition of factories is carried out by companies that have received the appropriate permits. Only experienced performers can demolish an industrial facility correctly, without the risk of injury to people and damage to property. The company “Forest-Ukraine” carries out dismantling of factories qualitatively, quickly and in accordance with the requirements of the law.
The importance of safety when dismantling factories
Safety during factory demolition and dismantling is an important issue that requires special attention. Incorrect actions can lead to serious consequences. For example, there may be injuries to people or damage due to destruction of property. The main reasons why safety during factory demolition is important are:
- risks to workers;
- negative impact on the environment;
- property damage;
- violation of the law.
Our company strictly complies with all safety requirements. This eliminates the occurrence of various emergencies during the dismantling of the factory.
The technical aspect of factory dismantling
Dismantling and demolition of factories requires coordinated actions by a team of specialists. It is necessary to perform many complex processes and procedures. Our employees use specialized equipment and tools, as well as new methods of demolition of structures. The main stages of dismantling and demolition of factories:
- Preparatory stage. The building is measured, risks are analyzed, and a demolition plan is created. Decisions are made regarding the use of specialized equipment and tools required for demolition.
- Equipment dismantling. Technological equipment, machines, and other systems installed inside the building are removed.
- Dismantling of walls and roof. Gradually, all components of the building are dismantled. First, the roof is dismantled, and then the wall and partition panels.
- Dismantling the foundations and the rest of the building. At the final stage, the foundation is removed, the excavation is filled in, and the site is prepared for further use.
Special equipment and tools help ensure the efficiency of the dismantling process.
Organizational aspect of factory dismantling
Proper organization of the factory demolition procedure is no less important than proper dismantling. Before carrying out the work, organizational procedures are carried out:
- Preparation for dismantling the factory. The purpose and scope of work are determined, and the specifics of the technical condition of the building and equipment are studied.
- Planning. An action plan and work schedule are developed, dismantling methods are selected, and what equipment and tools are needed are determined.
- Organization of the work area and compliance with the rules. The territory is zoned, work areas are separated from other areas. Safety rules are established for the working personnel, and their compliance is monitored.
- Control and evaluation of the work performed. After the factory demolition is completed, the work performed is controlled using special methods and tools.
All stages of demolition organization are carried out in accordance with the requirements of the standards.
The environmental aspect of factory dismantling
Factory dismantling can have a serious negative impact on the environment if not carried out properly. To reduce the likelihood of negative consequences, it is worth adhering to the norms of modern legislation in the field of environmental protection measures. We use the following approaches:
- Smart use of materials and resources.
- Waste minimization.
- Proper disposal of construction waste.
- Reducing the negative impact of chemicals on the environment.
This allows you to reduce adverse environmental impacts by ensuring compliance with legal regulations. Otherwise, you may receive a large fine.
Features of factory dismantling
Dismantling factories is a process that requires consideration of the following factors:
- Size and type of building.
- Presence of harmful and dangerous substances.
- Working with engineering systems.
- Restoration of territories and their further exploitation.
Our company successfully fulfills orders from clients from all over Ukraine. We have successfully carried out dismantling works of entire factories and partial demolition of certain structures of industrial facilities. You can watch a video of the process of dismantling pipes of the CRH cement plant and dismantling of the Galakton dairy plant.
The company “Forest-Ukraine” is a reliable contractor for dismantling of any complexity. Our team has many years of experience and uses modern equipment. Contact us by phone or via the feedback form.
Our projects
View all our worksLet's discuss your project
Thank you for your request
Frequently asked questions
To accurately calculate the cost, we need to obtain basic information about the object. In most cases, it is enough:
photo of the building from the outside (from all sides) and from the inside
technical passport or project (if available)
height of the building and number of floors
type of foundations (monolithic, prefabricated, pile, etc.)
approximate distance of transportation of construction waste
The more complete the initial information, the more accurate the calculation.
In more complex cases, we go to the object to inspect and prepare a detailed estimate.
In practice, dismantling with preservation of structures almost always turns out to be more expensive.
This is due to the fact that:
a significant part of the work is performed manually, without the use of heavy machinery
the execution time increases
the risks for workers and structures increase
In addition, most used materials already have a significant degree of wear or have exhausted their resource, so their further use or sale is not always economically feasible.
In many cases, complete dismantling with subsequent processing of materials (for example, into secondary crushed stone) is a more profitable and safe solution.
During dismantling, we immediately perform rough sorting of materials:
metal is separated and sent for recycling
concrete, brick and other mineral materials – separately
wood, plastic and other waste – separately
Furthermore, several options are possible:
Transportation to a landfill – a standard solution, but involves additional costs for disposal
Recycling of materials – we crush part of the concrete and brick into secondary crushed stone, which:
is used for backfilling, roads, preparation of foundations
can be implemented
We help you choose the best option to minimize the client’s costs.
Yes, we have experience in performing dismantling work on objects damaged as a result of war.
Such objects require a particularly careful approach, as they often have:
emergency and unstable structures
partial collapses
increased level of danger for personnel
Before starting work, we necessarily conduct an inspection, assess the technical condition of the building and develop a safe dismantling technology.
If necessary, we provide:
development of a PVR in a short time
phased dismantling with risk minimization
sorting and removal of construction waste
We work throughout the territory of Ukraine (except for zones of active hostilities) and are ready to respond promptly to such objects.
Yes, in most cases, the implementation of dismantling works requires the development of a work execution project (PVR).
We develop PVR in a short time – usually within 2-3 working days.
The document takes into account the dismantling technology, safety, sequence of work and organizational solutions.
Our company provides full support:
preparation of all necessary documentation
maintenance of executive documentation
work with VAT and official closing of volumes
That is, the client receives not only work, but a completely closed process in terms of documents and reporting.
Yes, we perform dismantling work throughout the territory of Ukraine, except for regions where active hostilities are ongoing.
We have our own fleet of machinery and equipment, which allows us to quickly:
mobilize a team
relocate equipment
start work in a short time
Thanks to this, we work effectively both on local sites and on large projects in different regions of the country.
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />
" alt="title" loading="lazy" />