Reconstruction of family medicine clinics: Rozhyshche and Khorokhoryn
The Forest-Ukraine company has completed the reconstruction of general practice family medicine clinics in the city of Rozhyshche and the village of Khorokhoryn, Volyn region. The work was carried out within the framework of the subproject “Improving medical care for patients with circulatory system diseases in Volyn region” – a joint project of the Ministry of Health of Ukraine with the World Bank “Improving healthcare at the service of the people”.
Paragraph
During the performance of the work, the company complied with the terms of the contract in terms of the performance of the work and compliance with the calendar schedule for the performance of the work, environmental protection measures, labor protection standards, compliance of the performed work with the requirements of the design and estimate documentation, building codes, technical conditions, state standards and rules, and the material resources used met the requirements of regulatory legal acts and regulatory documents in the construction industry, design and estimate documentation.
The complex of works included:
-dismantling works;
-general construction and finishing works;
-thermal insulation works;
-electrical supply;
-water supply and sewage, heating and ventilation
-fire alarm;
-lightning protection;
-external networks of heat supply, water supply, sewage
-reconstruction of the boiler room
-land improvement
-external lighting
The reconstructed premises are specially equipped for a medical institution. There are spacious offices and corridors, which is important for compliance with quarantine standards. There is an additional entrance to a separate manipulation room, where children will be vaccinated, so they will not intersect with patients waiting to see a doctor. Appropriate conditions have been created for people with disabilities – there are tactile paths, ramps, and specially equipped bathrooms.
Media mentions of our projects:
Another outpatient clinic opens in Rozhyshche
Building an outpatient clinic with World Bank funds: Khorokhoryn’s experience